The priorities of the owner, ship yard, yacht manager and designers are considered along with engine and generator installation and operational requirements. Anticipated engine running hours and the Classification Society demands are all important inputs during this consultation stage to ensure they are all understood and met as the final specification and design emerges.
From this consultation we develop a timescale, a project plan, and a design brief for the required system.